Clarendon Street
08-Jan-2016: Looking south along Clarendon Street from the Casino stop, you can see that the track is completely finished along the whole length of the street. Concrete was poured up to and level with the sleepers, then a sand base compacted down, then a topping of asphalt to bring the level of the street up to the rail head.
{1,600 x 900 pxl; 596k}
- 8 January 2016