steam4me

est. 1997

  1. Home
  2. Photo Gallery
  3. Trams
  4. Infrastructure
  5. 2011 Port Melbourne
  6. Day 9: 06-Feb-2011
  7. 2. At Graham

← Previous 2 of 7 Next →

2. At Graham

2. At Graham

Looking in-bound: in the background, the ballast train is back at Bridge Street being loaded with the last of the ballast. The tamper is sitting down at Beacon Cove, waiting for the last run of the ballast train. Graham Street stop is completed; the formwork for the pedestrian crossings are being placed.

1600 x 1000 pixels; 377k

← Previous 2 of 7 Next →

Photographs by Yuri Sos unless noted. steam4me home page